Finalizing the Plans and Specifications

The final plans and specifications are almost done. A planning meeting was held this morning with the electromechanical engineers (CIMA+) and their subcontractor in lighting and audiovisual systems (Dufour ressources créatives). This allowed us to determine the fine points of interior lighting, audio-visual installations, ventilation systems, as well as phone lines, internet connections, and intercoms. Our objective was to conceal contemporary infrastructure and ensure dramatic staging of our rooms using local lighting sources that will enhance the warmth and charm of our spaces.

Morrin

418 694-9147